Magnor Plant case study

Magnor Plant case study

Magnor Plant ensure site safety, meet HSE compliance and see a 70% reduction inspection times with Assettagz.

Safety is paramount at Magnor Plant so they needed an error-proof system to manage the on-going maintenance inspection schedule of lifting and safety equipment at its many construction sites across the UK.

Sites can be up and running from anything from two or three weeks to six years. And with as many as 6000 pieces of equipment on each site, undertaking these examinations is no mean feat.

"In the old days we'd carry out a manual inspection and, upon return from site, begin the arduous task of rekeying all the information into our mainframe system." says Stuart Faulkner, Safety Equipment Manager at Magnor. "We needed a way to reduce paperwork. Post-inspection administration and time spent rekeying data was getting out of hand."

Magnor now uses Assettagz RFID tags and handheld computers to manage assets and record inspection results in the field.

"The results speak for themselves: with Assettagz we have streamlined our entire inspection process and have cut post-inspection administration down from three or four days of lots of manual paperwork to one."

Read the full case study here >

Next steps
call us on 0116 216 5000Call us on 0116 216 5000
E-mail usE-mail us for more information
download the case studyDownload the case study >
download the brochure
Magnor Plant case study
subscribe to our e-updatesSubscribe to our e-updates >
read related informationRead related information